Boush Street Offices

Showing posts with label Chartway. Show all posts
Showing posts with label Chartway. Show all posts

Saturday, April 2, 2016

IONIC tackles Financial Institutions

Over the last month our office has been blessed with rewards in our pursuit of financial institutions specifically credit unions. We have been working on several local flag ship projects for several months. One is getting ready to start construction shortly while the other has been submitted for permits. Both look to finish construction by the end of the year or the first quarter of 2017.



We have been fortunate to work with Chartway is assisting their expansion and new branding efforts as far away as Houston Texas and Warwick Rhode Island. Texas is under construction and Rhode Island kicks off next week. Other local locations are in the works to evaluate existing offices for their potential renovations.



Navy Federal Credit Union started it all off a few years ago when we were selected to help with their new branch location in Chesapeake. Since then we have done nearly a dozen locations for them including one in Jacksonville Florida. Recently we were awarded the new construction project in Bowie Maryland.



Any day now we expect the Beach Muncipal Credit Union to be awarded and it will begin construction in Virginia Beach near the courthouse area. Be on the look out for our construction sign soon.

We thank our clients for trusting IONIC and allowing us to serve. We look forward to the new construction breaking ground all over. Best of luck and much success to all.

D. Eugene Thompson, AIA
Ionic DeZign Studios

"Creating places and spaces to enrich the lives of those who use them."

www.ionicdezigns.com

Friday, February 26, 2016

City Council Approval!



Well, believe it or not we received approval from the Norfolk city council on Tuesday night for the acceptance of the new flagship Chartway Federal Credit Union. I say "BELIEVE IT OR NOT" because only a few weeks prior Norfolk planning commission voted unanimously against it 0-7. So why the switch to a near complete flip for a 6-1 in favor? I think it was a matter of misunderstandings not clearly explained.

It wasn't about the building going there.....accepted by zoning.
It wasn't about the design....everyone was in favor of the look IONIC created.
The only reason we had to go in front of council was because we needed a drive thru on the bank which requires a special exception. Nothing else should have been up for discussion. However that isn't exactly how the story went.

The planning department indicated to our design team which included Pennoni for civil engineering, that the planning commission had this huge thing about moving buildings up onto the street front. They expected that this was going to be the case. Especially since we were in the Transit Overlay District. (TOD)......Whooo wait a minute! We are not currently in a TOD zone. We are in a potential TOD zone due to the light rail station right across the street. One of the purposes, which I feel is a great idea by the planning department and the city of norfolk in most cases, is to promote more pedestrian friendly buildings and circulation around areas with public transportation hubs.

However, even though there is a lite rail station across the street, this isn't currently a very friendly pedestrian environment. Have you ever been on the intersection of Newtown Road and Kempsville? It's pretty crazy busy with cars....which is why Chartway liked the location for its most heavily vehicular traveled branch. The surrounding buildings look to be long term users and redevelopment of this interesection doesn't appear to be in the near future.

To move the building up on the street corner would have prevented internal circulation of cars wrapping around the building properly to enter the drive thru teller line. It just wouldn't work. It would make the project unfeasible. However that isn't what the planning commission understood. They clearly just wanted a building up on the corner regardless of the functionality effected. That really shouldn't have been open for discussion. Remember we were really only there to get a drive thru approved. Without the drive thru, we could build the building and place it pretty much where we wanted on the site.

The design team did listen to the planning commissions requests and desires to make this a pedestrian friendly corner taking the opportunity to embellish the corner with a pedestrian table. It was elevated and brick paved to the street corner allowing the easy flow of pedestrians to the front doorway of the branch. We felt it was a really good compromise with the future TOD plans. So did city council. Thankfully we move forward with our project instead of a convenience store.

D. Eugene Thompson, AIA
President + Founder
Ionic DeZign Studios

www.ionicdezigns.com
Creating Places and Spaces that Enrich the Lives of Those Who Use Them


Wednesday, January 21, 2015

Chartway Federal Credit Union

UNDER CONSTRUCTION

Team IONIC is excited to see at least some of the construction beginning on the new renovated headquarters of Chartway. After developing multiple schemes that varied from extensive to minimal,mthe client elected to focus only at the entry way at this time. A floating glass canopy was engineered to minimize interruption with the work day activities by having much of the work prefabricated off site and set in place.

We were also very conscience about the interaction of existing structures to limited construction costs. We believe that once this grand entry feature is added to the facade, the owner will look to continue some further modications that included new sidewalk pavers, lighting and possible even a new fountain centered within the turn-about.

We look forward to seeing the pieces of the canopy being delivered and lifted in place soon. Be sure to watch for some updates and construction photos.

It is a team effort
Lead Architect: Matt Mazzoni

Ionic DeZign Studios
www.ionicdezigns.com
"Creating places and space to enrich the lives of those who use them."

Eugene Thompson